This is main home link
this is headquater image
this is regional image
india flag image Government of India

Central Water Commission

(Serving the nation since 1945)

River Management

This wing is responsible for, collection, compilation, storage and retrieval of hydrological and hydro-meteorological data including water quality monitoring, formulation and issue of flood forecast on all major flood prone rivers and inflow forecasts for selected important reservoirs, providing guidance to States in technical matters on different aspects of river and flood management in the country and regulation of multipurpose reservoirs, river morphology studies, techno-economic appraisal of various flood management schemes received from the State Governments, providing advice to coastal states on issues related to coastal erosion problems including preparation of National Coastal Protection Project (NCPP) for Coastal Protection works, survey and investigation of water resources development projects in India and neighbouring countries, monitoring of schemes under Centrally Sponsored Command Area Development (CAD) Programme, Accelerated Irrigation Benefit Programme (AIBP), Revival and Restoration of Water Bodies etc through field units of RM Wing and international co-operation with neighbouring countries in the field of flood forecasting.

The Wing is headed by an engineering officer designated as Member (RM) with the ex-officio status of Additional Secretary to Government of India. The wing comprises of organizations headed by Chief Engineer and consisiting of various Directorates each headed by Directors. Below is the organization chart of RM wing

What's New in CWC

The total water available in live storage of 100 reservoirs in the country being monitored by CWC was 54.258 BCM as on 01.08.2019.This is 33% of the total live storage capacity of these reservoirs and 80% of storage of average of last ten years : ..Read More

01/08/2019

Revised Draft Concept Note on "Premissible Velocity in Concrete Lined Water Condutor System (Head Race Tunnel) Conveying Water for Power Generation ( Comments may be sent latest by 15th July 2019) : Click here ..Read More

02/07/2019

5th meeting of Program Implementation Review Committee(PIRC) for CADWM, Mount Abu, 30 May 2019- chaired by Member (WP&P), CWC. Commissioner (CAD) MoWR, RD & GR, 12 Regional offices of CWC and 17 States and others participated in it.

04/06/2019

3rd Meeting of Cauvery Water Management Authority (CWMA) was held on 28 May 2019 under the Chairmanship of Sh. S.Masood Husain, Chairman, CWMA & CWC at CWC-HQ, New Delhi.

04/06/2019

User Manual For Uploading Publication/Flood Forecast on CWC website.Click here.

31/05/2019